Commit graph

3 commits

Author SHA1 Message Date
justin
303235a595 todo: note umami Goals/Funnels added for DOT, CRTC, Healthcare (was FCC-only) 2026-06-12 22:34:53 -05:00
justin
4638fbe3d2 umami: fix Goals/Funnels 'Something went wrong' (migrate saved reports to v3.1.0 schema)
The saved Goal + Funnel reports used a pre-v3.1.0 parameters shape (urls/dateRange)
that umami 3.1.0's report schema rejects (400 -> 'Something went wrong'). Migrated
both reports in the umami DB to the current funnelReportSchema/goalReportSchema
(steps[], top-level dates, goal type/value). Verified funnel route now passes schema
validation. TODO updated/closed.
2026-06-12 20:17:09 -05:00
justin
a648ae6e0a todo: track Umami Goals/Funnels 'Something went wrong' fix 2026-06-12 19:57:39 -05:00